15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
July 2  |  
July 1  |  
June 30  |  
June 28  |  
June 27  |  
Uncategorized

July 2

Full story
Master Bedroom

July 1

Full story
Uncategorized

June 30

Full story

Fibre Optic Arrives. First Floor Flooring 8

14 May 202424 June 2024 gjj

The free.com engineer is due this afternoon so I spent this morning with some small issues. First, I have installed a threshold for the workshop door as there will be different tiling inside the workshop ....

Continue reading
First Floor, Garden, Services

Fountain 1, Ground Floor Tiling 1, First Floor Flooring 7

13 May 202423 June 2024 gjj

I have removed the plastic shuttering for the fountain foundation and have started playing with how it will look. I was just about able to move the base unit in which the pump is housed. ....

Continue reading
Garden, Ground Floor

Fibre Optic Preparation

10 May 202423 June 2024 gjj

No photos today. Just me and Phillipe our neighbour on site pulling through fibre rods in preparation for the visit next week of free.com to install the fibre optique cables. It has been a long ....

Continue reading
Services

More Minor Changes and First Floor Flooring 6

7 May 202423 June 2024 gjj

The finished repair of the front arch. Some changes to the kerbstones. The heat pump position had to be changed (the base was extended some time ago for it) so the pathway became too narrow ....

Continue reading
Entrance Gates and Arch, External, First Floor, Garden, Garden Store, Services, Waste System

Workshop Window and First Floor Flooring 5

6 May 202423 June 2024 gjj

Today Florent and his team are back on site for a couple of days to sort out some minor snagging issues. So I have got them to help me fit the large fixed window in ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, First Floor, Windows

Workshop Window

3 May 202422 June 2024 gjj

Using my glass suction handles and a bit of ingenuity, I have been able to get the glass out of the frame and stood on some blankets. I have then fitted the frame in place ....

Continue reading
BBQ/Workshop, Windows

First Floor Flooring 4

2 May 202422 June 2024 gjj

With the heating pipes completed I am able to look at other issues so have started to construct a missing wall in the workshop. Meanwhile, almost imperceptibly, the first floor continues to advance.

Continue reading
BBQ/Workshop, First Floor

Underfloor Heating 7

1 May 202422 June 2024 gjj

Before encasing it in concrete, it is always a good idea to pressure test it for any leaks. (It passed).

Continue reading
Ground Floor, Plumbing

Underfloor Heating 6

29 April 202422 June 2024 gjj

The last item to remove from the house is the old stairs from our old property that I have been using to get up to the first floor with. With the floor clear I can ....

Continue reading
Ground Floor, Plumbing

First Floor Flooring 3

26 April 202422 June 2024 gjj

In order to install the final heating loop I have had to take down the scaffolding that has been there for ever it seems. The ground floor is now clear. As I explained earlier the ....

Continue reading
First Floor

Posts pagination

Previous page Page 1 … Page 21 Page 22 Page 23 … Page 45 Next page