External Thresholds
After a bit of going and frying with the windows supplier we finally have agreed sizes for the thresholds for the doors and the large fixed window. Utility door with muck ready to spread, work ....
After a bit of going and frying with the windows supplier we finally have agreed sizes for the thresholds for the doors and the large fixed window. Utility door with muck ready to spread, work ....
Finally the jointing is finished. Scaffold down at the front to reveal its new face and the internal wall also cleared (although still a bit damp as it is inside). The top of the attic ....
Front wall finished today (still to be brushed off) and a start made on the internal wall. Almost there.
Rear wall finished and dry. End wall finished and still wet at the base. Good progress on the front wall.
As part of clearing the car parking I have had to move all the PV panels, not just those for the BBQ area. Discovered a second one damaged unfortunately so that will also need replacing. ....
Some time ago Florent sourced some stone window cills but they were not deep enough for the window supplier. Some of the replacements have finally arrived and have been fitted at the rear of the ....
Having readily I can both form the boxes and the company websites I was finally ready to begin installing the PV panels. The first job was to unpack one to check measurements and I was ....
The rear wall is finally finished (still wet). The end wall just needs the lower level finishing off so the scaffolding is moved to the front of the house to begin cleaning out the joints ....
With the scaffolding down the wall can be seen and it looks fantastic. Small section around the tie bar to be finished off but the building is starting to look refreshed. Work has begun on ....
The holidays over, the entire team is back on site full of energy. As Esteban had virtually finished the rear wall except fro some low level areas, the scaffolding was stripped and prepared for the ....