PV Panels 11
I had cancelled the tilers because of the weather. It was partly because I did not want them laying the slabs in wet weather and partly because the weather had pushed my schedule back and I was not ready for them. They now start on Monday.
So I got in with the installation of the panels on the roof.
The wasps nests that I destroyed have been rebuilt and lifting the panels was made more difficult as I had to avoid the areas they were in.
By lunchtime I had finished the first half. The second half was wasp territory.
By leaving time they were all installed and I had only suffered three stings from the little blighters. No pain or swelling yet but it will come. The BBQ area is not finally clear. Finished item looks quite nice from the house.