Views of the property from the outside

PV Panels 2

17 March 202416 June 2024 gjj

Now that the doors and windows are in, birds that get in via the roof cannot get out through the openings. I keep finding them near the doors where they have literally knocked themselves senseless. ....

Continue reading
BBQ/Workshop, Photovoltaic Panels

PV Panels 1

15 March 202416 June 2024 gjj

A break in the weather so I have started to install the support system for the panels and inverters on the car park and BBQ/Workshop roofs.

Continue reading
BBQ/Workshop, Car Park, Photovoltaic Panels

Upper Mezzanine Floor 6

14 March 202422 June 2024 gjj

Time to move inside and make a start on the floor for the office on the upper mezzanine. First I had to finish securing the oak strengthening beams using the M12 threaded bar. Outside I ....

Continue reading
Bike Store, Garden, Garden Store, Upper Mezzanine

Barbecue Guttering 2

13 March 202414 March 2024 gjj

Today I decided to finish off the guttering to divert the water away from the wall and front of the BBQ. I still need to install a set of down pipes but they are less ....

Continue reading
BBQ/Workshop

BBQ Guttering 1

12 March 202414 March 2024 gjj

I dismantled my supports to paint them with a protective black stain prior to installing them. I used the same stain to finish off the cut sections of the timber frame. Here are before and ....

Continue reading
BBQ/Workshop, Timber Frame

Upper Mezzanine Floor 5

11 March 202414 March 2024 gjj

Started the day by trimming the joists in preparation for the oak fascia that has now been ordered but will a 4 to 6 week delivery! Experimented with the oak flooring to see how to ....

Continue reading
BBQ/Workshop, Upper Mezzanine

Upper Mezzanine Floor 3

6 March 202414 March 2024 gjj

As part of the balcony installation I need to install a fascia for the bolts. As I only had one beam left I decided to cut it in half lengthways. What a job! Even cutting ....

Continue reading
BBQ/Workshop, Upper Mezzanine

Fruit Trees

17 February 202423 February 2024 gjj

Since we bought the land I have wanted to sort and prune the fruit trees which have not been tended to for some years. I never got around to it at the last house but ....

Continue reading
Garden, Uncategorized

Internal Electrics

2 February 202411 February 2024 gjj

It does not looks much but it took most of the day to fit the 16mm cabling in the distribution board then make the final connection at the temporary supply. 16mm is difficult to work ....

Continue reading
Electrics, External, Ground Floor

Timber Frame Cladding Arrives

1 February 202411 February 2024 gjj

Sitting happily at home catching up with paperwork I got an urgent call from my neighbor Andrew. Apparently a lorry had arrived from Estonia with no notice containing our timber cladding of charred and oiled ....

Continue reading
External, Timber Frame

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 19
  • May 16
  • May 15
  • May 14
  • May 10

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.