June 13
Still waiting on the vapour barrier so only the internal walls can be sorted at the moment. The on going problem with the shutter over the front door, whose motor is effectively in the guest ....
Still waiting on the vapour barrier so only the internal walls can be sorted at the moment. The on going problem with the shutter over the front door, whose motor is effectively in the guest ....
I have redesigned to the fan and ventilation unit to get some shelving into the wall cupboard and it works quite well. The base unit has gone in but the outlet pipe still needs to ....
With no insulation or vapour barrier I am trying to use my time effectively so the IKEA cabinets have started to be assembled for the utility room. Upstairs I have completed the master bedroom internal ....
Closing out some fiddly jobs while waiting for an IKEA delivery. Internal walls of the cupboard space on the mezzanine walkway prepared and used as storage for the first floor ceiling insulation. IKEA delivery arrived ....
I need to design a support system in the wall before closing it off to ensure the towel rail does not get pulled off just plasterboard. So I have inserted a structure but not yet ....
The Master Bedroom is still to be finished but with the delivery of the hydro boards I have turned my attention to the two en-suites. After completing the wiring and the insulation, the boards can ....
Before installing the plasterboard I need to check all the wiring is in. Here I have temporarily hung the lights over the mezzanine walkway and one lamp for the office mezzanine.
Vapour barrier and plasterboard in the dressing room. I have repositioned the shutter controls to inside the rebate for the window as it is more convenient than on the outer wall as in this room, ....
With the plasterboard pile renewed I can get on with the upstairs. Here in the dressing room I have insulated and prepared the tapes to support the vapour barrier Likewise in the Master en suite ....