Skip to content
  • 05:39
  • Saturday
  • 7 June 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 23  |  
May 22  |  
May 21  |  
May 19  |  
May 16  |  

May 22

22 May 20256 June 2025 gjj

With the plasterboard pile renewed I can get on with the upstairs. Here in the dressing room I have insulated and prepared the tapes to support the vapour barrier

Likewise in the Master en suite where I have started to install the hydro board in the shower corner.

Dressing Room, First Floor, Master Bedroom En Suite

Post navigation

May 21
May 23

Recent Posts

  • May 23
  • May 22
  • May 21
  • May 19
  • May 16

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.