The Pergolas Arrive
The Douglas Fir pergolas have arrived together with the roofing materials. The three wheeled forklift was an amazing machine that could turn its wheels through 90 degrees to access difficult positions. Each pergola has been ....
The Douglas Fir pergolas have arrived together with the roofing materials. The three wheeled forklift was an amazing machine that could turn its wheels through 90 degrees to access difficult positions. Each pergola has been ....
I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....
The wall rendering is finished. The concrete support is re-shuttered to be raised to the new height. The hole to receive the far end of the new beam has been raised and moved to get ....
The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....
When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....