Skip to content
  • 07:01
  • Thursday
  • 18 September 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
August 2  |  
July 31  |  
July 25  |  
July 24  |  
July 23  |  
Master Bedroom En Suite

August 2

Full story
Dressing Room

July 31

Full story
Dressing Room

July 25

Full story

Tie bar and Internal Services

25 May 202311 February 2024 gjj

The tie bar arrived late last night and when I arrived this morning it had already been positioned. I helped with the tensioning but essentially it is done and the remaining wall can be taken ....

Continue reading
Car Park, External, Kitchen, Utility

Electrics and Utility Door

24 May 202311 February 2024 gjj

Hmm. Still trying to figure out how to connect the temporary supply as there were no instructions with the pre-wired unit. I need my multi-meter to work it all out. Esteban has finished shuttering the ....

Continue reading
External, Utility

Utility Door Opening

24 May 202311 February 2024 gjj

The pile of chalk is for blinding the levelled ground but Florent is off site today. Esteban started knocking through the new doorway in the utility room where the old chimney used to be. Meanwhile ....

Continue reading
Car Park, External, Lounge, Utility

BBQ and Services

22 May 202311 February 2024 gjj

When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Internal Breakout

19 May 202311 February 2024 gjj

With the pathway down to the house, The contractors concentrated on breaking out and levelling the internal floor and removing the internal wall. They did not take it all down as there was concern about ....

Continue reading
Kitchen, Lounge, Utility

Pathway Progress

19 May 202311 February 2024 gjj

By Friday morning they were moving down the site preparing and compacting the pathway that will join the gates to the house but will also serve as the temporary roadway for Florent to get materials ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden

The Contractors Begin

17 May 202311 February 2024 gjj

Florent Maitre and his team arrived Monday 15th to start on site and I was there first thing to hand it over to him. The rest of the day and Tuesday I was otherwise occupied ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden

Floor Removal and Tidying Up

14 May 202311 February 2024 gjj

Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden, Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Backfilling 2

13 May 202311 February 2024 gjj

Philippe is once more in attendance as we push hard to finish backfilling the trenches. In between I also started and managed the fire to get that area cleared. Needed to dig a short length ....

Continue reading
External, Garden

Backfilling 1

12 May 202311 February 2024 gjj

With the trenches filled with cables and sand we added the warning tape and buried a large number of excess stones above it to protect it further. Once again it was Philippe who came over ....

Continue reading
External, Garden

Posts pagination

Previous page Page 1 … Page 41 Page 42 Page 43 … Page 47 Next page

Recent Posts

  • August 2
  • July 31
  • July 25
  • July 24
  • July 23

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.