First Floor Joists 5
First section of the floor installed. Florent will also need this side of the building to ache a floor for accessing the original windows that need their lintels raising to get the electric volets in ....
First section of the floor installed. Florent will also need this side of the building to ache a floor for accessing the original windows that need their lintels raising to get the electric volets in ....
Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....
With the floor in, the windows can be started at the back of the house. To get the scaffolding up outside the eventually pathway needed to be part laid. By the end of the day ....
I am working hard to keep ahead of Florent and his team. they need a floor in to be able to set scaffolding and work on opening the upstairs windows. so once I had enough ....
The first floor sits between new joists and above the existing beam. First the wall joists (double) were installed and bolted with a special resin. Than the hangers added. Despite all my planning, the bolts ....
I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....