The Contractors Begin

17 May 202311 February 2024 gjj

Florent Maitre and his team arrived Monday 15th to start on site and I was there first thing to hand it over to him. The rest of the day and Tuesday I was otherwise occupied ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden

Floor Removal and Tidying Up

14 May 202311 February 2024 gjj

Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden, Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Backfilling 2

13 May 202311 February 2024 gjj

Philippe is once more in attendance as we push hard to finish backfilling the trenches. In between I also started and managed the fire to get that area cleared. Needed to dig a short length ....

Continue reading
External, Garden

Backfilling 1

12 May 202311 February 2024 gjj

With the trenches filled with cables and sand we added the warning tape and buried a large number of excess stones above it to protect it further. Once again it was Philippe who came over ....

Continue reading
External, Garden

Electrical Jigsaw Completed

10 May 202311 February 2024 gjj

So the last bit of electrical work is to install the 16mm² cable through to the car park and main road connection. It is the cable on the large wooden bobbin. Also to install the ....

Continue reading
External, Garden

Garden Lights

8 May 202311 February 2024 gjj

With the main services now in and the trenches more or less backfilled, I am concentrating on the minor services including laying cable for the path lights and fountain. More trenches that need to be ....

Continue reading
Bike Store, External, Garden

Electrics and Telecommunications

7 May 202311 February 2024 gjj

So with the water in I am now lying the electrical and last of all, the telecoms gain. the bottom picture shows the me laying out the gaine (green) around the garden (including around trees ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden

Crossing the Site Boundary

6 May 202311 February 2024 gjj

Florent dug the trench up to the doorway but left me to do the bit up to the water main box. I followed his guidance from the evening before and it was surprisingly easy to ....

Continue reading
Entrance Gates and Arch, External, Garden

More Trenches

5 May 202311 February 2024 gjj

Temporary water supply pipework installed although there is not yet a connection to the the main box that I will have to sort out. Trenches are full of roots around the trees that need to ....

Continue reading
Entrance Gates and Arch, External, Garden

Electrical Installation

4 May 202311 February 2024 gjj

Digging the trench and laying the gaine is one thing but getting the cable into the gaine is something else. The 2.5 mm² cable is light but starts to buckle and then forms a blockage. ....

Continue reading
External, Garden

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.