With the main services now in and the trenches more or less backfilled, I am concentrating on the minor services including laying cable for the path lights and fountain. More trenches that need to be dug carefully as they cross existing trenches already laid and backfilled.
This trench is to the side of the future path to the house and has the connections for the path lighting.