Month: May 2023

Replacing the Duff Cable

31 May 202311 February 2024 gjj

After installing all the main cables underground, I received a call from the supplier to say that the manufacturer had condemned one of the cables as they had uncovered a manufacturing fault. Great! They shipped ....

Continue reading
External, Garden, Utility

Ground Floor Begins

30 May 202311 February 2024 gjj

Florent and Esteban have levelled most of the floor and have begun to install the insulation over a damp proof course that forms the sublayer of the ground floor. The wooden boards are in place ....

Continue reading
Lounge

Electrical Connection and Caravans

27 May 202311 February 2024 gjj

Finally sorted the electrics with the multi-meter. The temporary cable has been run to the future meter box position on the garden wall. There I have connected the three phase supply to one of of ....

Continue reading
Car Park, External

Electrics and External Progress

26 May 202311 February 2024 gjj

The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....

Continue reading
BBQ/Workshop, Car Park, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Tie bar and Internal Services

25 May 202311 February 2024 gjj

The tie bar arrived late last night and when I arrived this morning it had already been positioned. I helped with the tensioning but essentially it is done and the remaining wall can be taken ....

Continue reading
Car Park, External, Kitchen, Utility

Electrics and Utility Door

24 May 202311 February 2024 gjj

Hmm. Still trying to figure out how to connect the temporary supply as there were no instructions with the pre-wired unit. I need my multi-meter to work it all out. Esteban has finished shuttering the ....

Continue reading
External, Utility

Utility Door Opening

24 May 202311 February 2024 gjj

The pile of chalk is for blinding the levelled ground but Florent is off site today. Esteban started knocking through the new doorway in the utility room where the old chimney used to be. Meanwhile ....

Continue reading
Car Park, External, Lounge, Utility

BBQ and Services

22 May 202311 February 2024 gjj

When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Internal Breakout

19 May 202311 February 2024 gjj

With the pathway down to the house, The contractors concentrated on breaking out and levelling the internal floor and removing the internal wall. They did not take it all down as there was concern about ....

Continue reading
Kitchen, Lounge, Utility

Pathway Progress

19 May 202311 February 2024 gjj

By Friday morning they were moving down the site preparing and compacting the pathway that will join the gates to the house but will also serve as the temporary roadway for Florent to get materials ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden

Posts navigation

Older posts

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.