Category: Ground Floor

August 11

11 August 202527 April 2026 gjj

Time to concentrate on getting a shower and toilet installed before the move.

Continue reading
Shower Room, Uncategorized

August 6

6 August 202527 April 2026 gjj

Guest ensuite lights and ventilation in. The most important part of the move into the house. The utility room cupboards and work surfaces start to go in.

Continue reading
Cold Store, Guest Bedroom En Suite, Uncategorized, Utility

August 5

5 August 202527 April 2026 gjj

Wardrobes fitted. Guest en-suite lights and ventilation going in and ceiling hole from moving lights repaired. Furniture begins to pile up in the lounge as we start to empty the rental property in preparation for ....

Continue reading
Dressing Room, Guest Bedroom En Suite, Lounge, Uncategorized

August 2

2 August 20253 August 2025 gjj

The first washing machine (which will eventually end up in the coldstore) is temporarily installed. 30 years old but the Miele is still working well. Time has come for me to mark out and cut ....

Continue reading
Master Bedroom, Master Bedroom En Suite, Utility

July 31

31 July 20253 August 2025 gjj

Lee finished and left site Tuesday. Dominic and I spent Monday moving the plasterboard outside under protective plastic to make room for the incoming furniture. Tuesday and Wednesday were spent moving the furniture from the ....

Continue reading
Dressing Room, Kitchen, Utility

July 25

25 July 20253 August 2025 gjj

A trip to collect some wood for a solid solution and then fit it and cover it with nano board ready for tiling. Lee has prioritised the painting of the dressing room so that I ....

Continue reading
Dressing Room, Shower Room

July 24

24 July 20253 August 2025 gjj

The PVA paint applied and dried.I then set out the tiling lines to avoid silly cuts and set a horizontal starting point. Eventually the bottom tiles will be cut to match the slope of the ....

Continue reading
Shower Room

July 23

23 July 20253 August 2025 gjj

Lee has now applied a second coat to most of the surfaces. One final one to go then it is sanding prior to painting. The proper bandstand has arrived which is far more secure. With ....

Continue reading
Guest Bedroom, Guest Bedroom En Suite, Lounge, Lower Mezzanine, Master Bedroom, Master Bedroom En Suite, Shower Room, Upper Mezzanine

July 21

21 July 20253 August 2025 gjj

Lee is on site today and working upstairs so I am back downstairs crying on with more plaster boarding to get the switches properly installed. Spot the difference on this section of wall in the ....

Continue reading
Lounge

July 17

17 July 20253 August 2025 gjj

It was a long time ago I installed these switches and sorting the spaghetti of wires to reposition them from the rebate wall to the staircase wall was a bit of a challenge. I experimented ....

Continue reading
Lounge, Upper Mezzanine

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.