More Fencing and Floorboards
Dancing posts and gate cemented in. Lead flashing on storage roofs and the final joists are fitted.
Dancing posts and gate cemented in. Lead flashing on storage roofs and the final joists are fitted.
More work on the attic floor joists while externally the ground is flattened and the pathway foundation rubble laid.
With the old warped beams removed from the upper mezzanine, a support beam to level the new oak beams is placed in position. With the first floor and lower mezzanine joists in place I have ....
While the guys have been installing the kerbstones by the car park and around the house, I have got on with installing the first floor joists.
The concrete base has gone into the garden store. And the new replacement beam has been installed over the existing one that gave me concerns at one end. Also te high level beam is in ....
Florent's team returned to site today and immediately set about installing the missing floor beams that were recently delivered for both the first floor and attic . By the end of the day the attic ....
Well the electrical hoist packed up (the control handle simply came apart and cannot be put back together again. So I have invested in a slower but reliable manual alternative. While installing it I captured ....
The pergola does use some nuts and bolts but the main method of fixing is old fashioned hard wood pegs. The whole structure wobbles a bit as they are driven home. The problem I have ....
If you have never seen it, this is sand blasting in progress. Jonathan has cleaned the wall (that will be exposed in the Lounge) and is here cleaning up the joists that will remain visible ....
I need to lift a lot of materials to the upper floors so I have bought and installed an electric hoist identical to the one I had at Le Chai. Making a start on the ....