December 3

After a lo0t of hassling, the fitter finally arrived to turn on the heating system that was installed months previously as it is getting cold to work here.

Two teams installed additional pipework and commissioned the heat pump and compressor.

I kept out of their way and worked on the workshop, finishing off the corner by the local distribution board so that Jude’s shelves for her restoration tools can be set up. The wall, switches and plugs went in to plan.

Almost completed the shelving but it will have to wait until tomorrow now.