First Floor Joists 7

21 July 202311 February 2024 gjj

Finally got around to starting the next line of joists for the temporary floor for the builders to access the last of the existing windows that needs its lintel raising.

Continue reading
First Floor

Oak Flooring Moved!

20 July 202311 February 2024 gjj

Started yesterday but finished today. The oak flooring has been moved from the drive to be stored internally. Currently serving as my temporary workbench/store as it will not be needed for some time.

Continue reading
First Floor, Ground Floor

Windows 4 and Oak Floor

19 July 202311 February 2024 gjj

The floor beam on the new concrete pedestal has been bolted with resin. The exiting windows are having their lintels raised and the view of the back of the house starts to take shape. Another ....

Continue reading
External, Windows

Windows 3

13 July 202311 February 2024 gjj

Putting my temporary floor to good use. The stone wall is rebuilt on the inside over the new concrete lintel.

Continue reading
First Floor, Windows

Windows 2

12 July 202311 February 2024 gjj

Good progress on the windows that are now nearly all concreted. One more to go. A new external office by the caravan.

Continue reading
Car Park, Windows

First Floor Joists 6

10 July 202311 February 2024 gjj

I have laid the floor in the right direction this time as it is just enough for the scaffolding to fit onto. View from the bedroom window.

Continue reading
First Floor, Windows

First Floor Joists 5

8 July 202311 February 2024 gjj

First section of the floor installed. Florent will also need this side of the building to ache a floor for accessing the original windows that need their lintels raising to get the electric volets in ....

Continue reading
First Floor

First Floor Joists 4

7 July 202311 February 2024 gjj

Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....

Continue reading
External, First Floor, Ground Floor, Windows

First Floor Joists 3

6 July 202311 February 2024 gjj

With the floor in, the windows can be started at the back of the house. To get the scaffolding up outside the eventually pathway needed to be part laid. By the end of the day ....

Continue reading
External, Kitchen, Lounge

First Floor Joists 2

5 July 202311 February 2024 gjj

I am working hard to keep ahead of Florent and his team. they need a floor in to be able to set scaffolding and work on opening the upstairs windows. so once I had enough ....

Continue reading
First Floor

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.