While the guys have been installing the kerbstones by the car park and around the house,
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1574-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1573-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1572-1024x576.jpeg)
I have got on with installing the first floor joists.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1571-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1570-1024x576.jpeg)
While the guys have been installing the kerbstones by the car park and around the house,
I have got on with installing the first floor joists.