15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
August 31  |  
August 24  |  
August 22  |  
August 21  |  
August 20  |  

Author: gjj

July 22

22 July 20253 August 2025 gjj

Lee has progressed well even through he is on his own. I occupied myself by building and fitting the wardrobe units for the mezzanine space. The right had sifde was a little tight but I ....

Continue reading
Guest Bedroom, Lower Mezzanine, Master Bedroom

July 21

21 July 20253 August 2025 gjj

Lee is on site today and working upstairs so I am back downstairs crying on with more plaster boarding to get the switches properly installed. Spot the difference on this section of wall in the ....

Continue reading
Lounge

July 20

20 July 20253 August 2025 gjj

It is Sunday and I have come in to do some final touches before Lee arrives next week. He has asked me to foam fill any large gaps in the boards. They will be cut ....

Continue reading
Upper Mezzanine

July 18

18 July 20253 August 2025 gjj

More plasterboard manipulation in the office area to get the boards up. I did get it finished but forgot to photograph it.

Continue reading
Upper Mezzanine

July 17

17 July 20253 August 2025 gjj

It was a long time ago I installed these switches and sorting the spaghetti of wires to reposition them from the rebate wall to the staircase wall was a bit of a challenge. I experimented ....

Continue reading
Lounge, Upper Mezzanine

July 16

16 July 20253 August 2025 gjj

Although the first floor rooms are ready I also want to get the upper mezzanine prepared for jointing and painting. To do that sensibly, I need to plasterboard the wall that rises from the ground ....

Continue reading
Lounge, Upper Mezzanine

July 15

15 July 20253 August 2025 gjj

Everything is now ready for Lee to come in and joint the boards with the exception of this corner in the guest bedroom. The issues with the volet over the front door has still not ....

Continue reading
Cold Store, Guest Bedroom

July 12

12 July 202513 July 2025 gjj

Yesterday was spent moving the remaining items from the storage area so it could go off hire and save some money. The weather has been very kind and most of the stuff brought over is ....

Continue reading
Dressing Room

July 10

10 July 20253 August 2025 gjj

With the insulation in place the cabling can be prepared. Took some time as the original design would not work with the positions of the ceiling support bars but eventually I found a spacing that ....

Continue reading
Master Bedroom, Master Bedroom En Suite

July 9

9 July 202513 July 2025 gjj

Into the master bedroom. First is the insulation. It is hot and sweaty and I am wearing a full face mask to avoid inhaling the dust so not a pleasant job.

Continue reading
Master Bedroom

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.