17 March 202416 June 2024 gjj

Now that the doors and windows are in, birds that get in via the roof cannot get out through the openings. I keep finding them near the doors where they have literally knocked themselves senseless. ....

Continue reading
BBQ/Workshop, Photovoltaic Panels

PV Panels 1

15 March 202416 June 2024 gjj

A break in the weather so I have started to install the support system for the panels and inverters on the car park and BBQ/Workshop roofs.

Continue reading
BBQ/Workshop, Car Park, Photovoltaic Panels

Upper Mezzanine Floor 6

14 March 202422 June 2024 gjj

Time to move inside and make a start on the floor for the office on the upper mezzanine. First I had to finish securing the oak strengthening beams using the M12 threaded bar. Outside I ....

Continue reading
Bike Store, Garden, Garden Store, Upper Mezzanine

Barbecue Guttering 2

13 March 202414 March 2024 gjj

Today I decided to finish off the guttering to divert the water away from the wall and front of the BBQ. I still need to install a set of down pipes but they are less ....

Continue reading
BBQ/Workshop

BBQ Guttering 1

12 March 202414 March 2024 gjj

I dismantled my supports to paint them with a protective black stain prior to installing them. I used the same stain to finish off the cut sections of the timber frame. Here are before and ....

Continue reading
BBQ/Workshop, Timber Frame

Upper Mezzanine Floor 5

11 March 202414 March 2024 gjj

Started the day by trimming the joists in preparation for the oak fascia that has now been ordered but will a 4 to 6 week delivery! Experimented with the oak flooring to see how to ....

Continue reading
BBQ/Workshop, Upper Mezzanine

Upper Mezzanine Floor 4

8 March 202414 March 2024 gjj

As the oak came from the supplier with marks on it I have decided to plan and/or sand it back to fresh wood. The belt sander dealt with it quite quickly. I then installed the ....

Continue reading
Upper Mezzanine

Upper Mezzanine Floor 3

6 March 202414 March 2024 gjj

As part of the balcony installation I need to install a fascia for the bolts. As I only had one beam left I decided to cut it in half lengthways. What a job! Even cutting ....

Continue reading
BBQ/Workshop, Upper Mezzanine

Upper Mezzanine Floor 2

5 March 202414 March 2024 gjj

I need to cut some of the oak beam ends and they are heavy. Much too heavy to balance on the chop saw now it is on its stand. So, a sawhorse is required and ....

Continue reading
Upper Mezzanine

Upper Mezzanine Floor 1

4 March 202414 March 2024 gjj

Just a half day on site today and it was slow progress as I have been cutting and drilling oak beams. Only on photo of the first section of beam cut, drilled and positioned under ....

Continue reading
Upper Mezzanine

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.