Upper Mezzanine Floor 2
I need to cut some of the oak beam ends and they are heavy. Much too heavy to balance on the chop saw now it is on its stand. So, a sawhorse is required and using scrap wood I made one. Works fine.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2024/03/IMG_1972-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2024/03/IMG_1973-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2024/03/IMG_1974-1024x576.jpeg)
If you look carefully you will see the drill on the oak beams I drill through for the threaded bar and coach bolts I will use to fix it. Once drilled I had to support it in place using the racket straps so that I could mark the main beam for drilling.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2024/03/IMG_1975-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2024/03/IMG_1976-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2024/03/IMG_1977-1024x576.jpeg)