General Tidy Up
Tidying up the site after the tilers have gone.
Flower pots appear on the patio and more washing down of the slabs.
Last of the big pots moved.
Cladding wood moved and stored in the garage while the space is prepared to receive the caravan as I get the site ready for Florent to return and do the final visit to tidy up the site and level it.
The water butt is replaced in its final position. Just need to sort out the guttering to feed it now.