Skip to content
  • 20:21
  • Saturday
  • 10 May 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 3  |  
April 30  |  
April 29  |  
April 28  |  
April 24  |  
First Floor

May 3

Full story
Kitchen

April 30

Full story
Kitchen

April 29

Full story

Underfloor Heating 5

22 April 202422 June 2024 gjj

I am pressing on with the heating as the floor screeners are due soon and this must be finished for them. In order to avoid moving the (heavy) roll of tubing all the time I ....

Continue reading
Ground Floor, Plumbing

Underfloor Heating 4

20 April 202422 June 2024 gjj

Back indoors and downstairs to fit the next loop in the heating. This time it is the kitchen, avoiding not just the walls but also the future units including the island un unit. Working with ....

Continue reading
Ground Floor, Kitchen, Plumbing

Car Park Services 2

18 April 202422 June 2024 gjj

While I got on with finishing my panelling in the car park, Stephane sorted the incoming main and fitted a tap in the BBQ area. With the panelling all up I was able to refit ....

Continue reading
BBQ/Workshop, Car Park, Garden, Plumbing, Services

Car Park Services 1

17 April 202422 June 2024 gjj

I am using some of the oak I cut that was not used to support the electrical panel in the car park. Stephane is coming tomorrow to redo the plumbing so I have taken it ....

Continue reading
Car Park, Electrics, Plumbing

Underfloor Heating 3

16 April 202422 June 2024 gjj

While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....

Continue reading
Ground Floor, Lower Mezzanine, Plumbing, Upper Mezzanine

First Floor Flooring 1

15 April 202422 June 2024 gjj

So, with the upper mezzanine done I have moved to the lower mezzanine which is also the first floor and made a start on the oak flooring. I have had to jigsaw the boarding around ....

Continue reading
First Floor, Lower Mezzanine

Upper Mezzanine Floor 11

12 April 202422 June 2024 gjj

This morning I finished off the final sections of the floor and trimmed it back to the beam before nailing it down. Looks good from above and below but despite my careful sorting it appears ....

Continue reading
BBQ/Workshop, Upper Mezzanine

Upper Mezzanine Floor 10

11 April 202422 June 2024 gjj

While I progressed the flooring on the mezzanine, Socover returned to site to do some alterations to the windows and doors. The biggest change was the reversal of the door hinging on the door to ....

Continue reading
Upper Mezzanine

Upper Mezzanine Floor 9

10 April 202422 June 2024 gjj

Good progress on the floor. The end will need to be trimmed against the beam and then cloaked by the oak panel when it finally arrives. I can now stand on it to work from. ....

Continue reading
Upper Mezzanine

Upper Mezzanine Floor 8

9 April 202422 June 2024 gjj

Sanding finished. Before and after shots that show the black stains removed. I then set out the first line of the parquet flooring. I started on this side so the Final Cut piece will be ....

Continue reading
Upper Mezzanine

Posts pagination

Previous page Page 1 … Page 19 Page 20 Page 21 … Page 42 Next page

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.