July 11

Florent arrives on site and the piles of stone are finally cleared. Large formations stones from old farm buildings that have been excavated during the works are moved (by me) to the storage area.

More items to get out of the way for Florent and finally it is time to burn the old palettes (with an Arrête from the Mairie. Bizarrely, an Arrête is not a stop but a permission to go ahead).