July 8

The sewage fosse arrives!

It is a lot bigger than it looks in the pictures. Main chamber on the right and the overflow liquid chamber on the right.

An internal pump aerates the liquids and they then overflow into this pre well that holds the liquid for final settlement prior to releasing the the drainage system. Each flush in delivers liquid out of here to the buried pipes that sit in the filter bed of special stones under the lawn.

Some sample stones to decide what to use on the drive and pathways.

Travertine stone slabs for the bathrooms stored outside to keep them out of the way but now they are in the way of Florent levelling the rear garden so they have to be moved a new crate on the finished patio for now.

More tidying upon materials lying around the site or in the way of the caravan move. This area at the top of the garden is the long term storage area. It is semi obscured by the cedar tree so has less visual impact up here.