Workshop Corner Cladding
The corner of the workshop is now structurally complete and so I have wrapped the membrane over it from the outside. I then added the cladding support battens and starting at the far end, applied ....
Views of the property from the outside
The corner of the workshop is now structurally complete and so I have wrapped the membrane over it from the outside. I then added the cladding support battens and starting at the far end, applied ....
On my mission to clear the garden before Florent returns, I decided to move the doors I recovered from the fire damaged house. They have been leaning against the tree for over a year now. ....
The tiles and grouting are set so I have cleaned them down (many were still stained with fire damage and charcoal) and started to replace the items in the workshop. As you can see I ....
Metawaley grouted as much as he could in the house but ran out of material and my supplier had none left so I have had to order it. He was able to finish the grouting ....
Monday morning and no translator. we use google translate and get by pretty well.Matetawaley is enamoured with Judith after the excellent dinner we had last night. The shower is built and then tiled around and ....
It is Sunday morning and the tiling continues. I turn my attention to the corner all in the workshop to develop its structure. no drawings here I am winging it off the top of my ....
It is Friday morning and I have come in just to lay the fall for the shower floor. The tiles are there to hold the pieces of wood that are protecting the sides. Once finished ....
I have finally received instructions on how to reset the Tesla charger and by following their instructions, I finally got it up and running. This records the first three phase charge using 16 Amps and ....
Second day of screed mixing. Good progress but the materials are running out. Even with the extra bags of sand you can see in the driveway that were delivered this morning it will not be ....
Today the screeders arrived to lay the ground floor over the underfloor heating pipes. While they organised themselves, I finished off the installation of the earthing points in both the workshop and the car park ....