External Slabs 4
In my continuing quest to clear the site as much as possibleI have loaded the trailer for the recycling centre. I have been installing and testing the internet system to enable me to get the ....

PV Panels 9
I am not keen on moving the PV Panels yet again and despite chasing MG Habitat for a return to site date I have heard nothing back. So I have decided to install them on ....

EV Charging, Travertine, Fountain and Ground Floor Tiling 6
I have finally received instructions on how to reset the Tesla charger and by following their instructions, I finally got it up and running. This records the first three phase charge using 16 Amps and ....

Ground Floor Tiling 4
It is Monday morning and although I came over on Saturday to see what was happening I forgot to take a photo. They did turn up and brought enough materials to finish as can be ....

First Floor Flooring 9, EV Charger installed
A record of the position of the central point of the fibre optic cable where the rods were brought together. Now all buried and without the inspection chamber that is now redundant. On the first ....

Fibre Optic Arrives. First Floor Flooring 8
The free.com engineer is due this afternoon so I spent this morning with some small issues. First, I have installed a threshold for the workshop door as there will be different tiling inside the workshop ....
Fibre Optic Preparation
No photos today. Just me and Phillipe our neighbour on site pulling through fibre rods in preparation for the visit next week of free.com to install the fibre optique cables. It has been a long ....

More Minor Changes and First Floor Flooring 6
The finished repair of the front arch. Some changes to the kerbstones. The heat pump position had to be changed (the base was extended some time ago for it) so the pathway became too narrow ....