15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
August 31  |  
August 24  |  
August 22  |  
August 21  |  
August 20  |  

Category: Ground Floor

Ground Floor Tiling 11

27 May 202423 June 2024 gjj

Monday morning and no translator. we use google translate and get by pretty well.Matetawaley is enamoured with Judith after the excellent dinner we had last night. The shower is built and then tiled around and ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 10

26 May 202423 June 2024 gjj

It is Sunday morning and the tiling continues. I turn my attention to the corner all in the workshop to develop its structure. no drawings here I am winging it off the top of my ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 9

25 May 202423 June 2024 gjj

Saturday morning and the tilers arrive. Metawaley (who cannot drive or speak French, in red) and Oury (who can only work on weekends, drives and translates to arabic). I laid out the lines for them ....

Continue reading
Ground Floor

Ground Floor Tiling 8

24 May 202423 June 2024 gjj

It is Friday morning and I have come in just to lay the fall for the shower floor. The tiles are there to hold the pieces of wood that are protecting the sides. Once finished ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 7

23 May 202423 June 2024 gjj

Back to the shower drainage as the drains have arrived and the tilers are due to start on Saturday. This must be finished for them so I need to progress it. First I had to ....

Continue reading
Ground Floor

EV Charging, Travertine, Fountain and Ground Floor Tiling 6

22 May 202423 June 2024 gjj

I have finally received instructions on how to reset the Tesla charger and by following their instructions, I finally got it up and running. This records the first three phase charge using 16 Amps and ....

Continue reading
Electrics, Garden, Ground Floor

Ground Floor Tiling 4

20 May 202423 June 2024 gjj

It is Monday morning and although I came over on Saturday to see what was happening I forgot to take a photo. They did turn up and brought enough materials to finish as can be ....

Continue reading
Electrics, Ground Floor, Utility

Ground Floor Tiling 3

17 May 202423 June 2024 gjj

Second day of screed mixing. Good progress but the materials are running out. Even with the extra bags of sand you can see in the driveway that were delivered this morning it will not be ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 2

16 May 202423 June 2024 gjj

Today the screeders arrived to lay the ground floor over the underfloor heating pipes. While they organised themselves, I finished off the installation of the earthing points in both the workshop and the car park ....

Continue reading
BBQ/Workshop, Car Park, Ground Floor

Fountain 1, Ground Floor Tiling 1, First Floor Flooring 7

13 May 202423 June 2024 gjj

I have removed the plastic shuttering for the fountain foundation and have started playing with how it will look. I was just about able to move the base unit in which the pump is housed. ....

Continue reading
Garden, Ground Floor

Posts navigation

Older posts