Skip to content
  • 23:43
  • Sunday
  • 6 July 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
July 2  |  
July 1  |  
June 30  |  
June 28  |  
June 27  |  

Category: Ground Floor

Final Floor Beams 2

21 October 202311 February 2024 gjj

The concrete base has gone into the garden store. And the new replacement beam has been installed over the existing one that gave me concerns at one end. Also te high level beam is in ....

Continue reading
Attic, First Floor, Garden Store, Ground Floor, Kitchen, Lounge, Lower Mezzanine, Upper Mezzanine

Final Floor Beams 1

18 October 202311 February 2024 gjj

Florent's team returned to site today and immediately set about installing the missing floor beams that were recently delivered for both the first floor and attic . By the end of the day the attic ....

Continue reading
Lounge, Lower Mezzanine, Upper Mezzanine

Jointing 11 (The End!)

13 September 202311 February 2024 gjj

Finally the jointing is finished. Scaffold down at the front to reveal its new face and the internal wall also cleared (although still a bit damp as it is inside). The top of the attic ....

Continue reading
Attic, External, Lounge

Jointing 10

11 September 202311 February 2024 gjj

Front wall finished today (still to be brushed off) and a start made on the internal wall. Almost there.

Continue reading
External, Lounge

Sand Blasting

25 July 202311 February 2024 gjj

If you have never seen it, this is sand blasting in progress. Jonathan has cleaned the wall (that will be exposed in the Lounge) and is here cleaning up the joists that will remain visible ....

Continue reading
External, First Floor, Lounge, Lower Mezzanine, Upper Mezzanine

Oak Flooring Moved!

20 July 202311 February 2024 gjj

Started yesterday but finished today. The oak flooring has been moved from the drive to be stored internally. Currently serving as my temporary workbench/store as it will not be needed for some time.

Continue reading
First Floor, Ground Floor

First Floor Joists 4

7 July 202311 February 2024 gjj

Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....

Continue reading
External, First Floor, Ground Floor, Windows

First Floor Joists 3

6 July 202311 February 2024 gjj

With the floor in, the windows can be started at the back of the house. To get the scaffolding up outside the eventually pathway needed to be part laid. By the end of the day ....

Continue reading
External, Kitchen, Lounge

External Concreting

4 July 202311 February 2024 gjj

I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....

Continue reading
BBQ/Workshop, Bike Store, External, Kitchen, Utility

External Concreting Preparation

30 June 202311 February 2024 gjj

The wall rendering is finished. The concrete support is re-shuttered to be raised to the new height. The hole to receive the far end of the new beam has been raised and moved to get ....

Continue reading
BBQ/Workshop, Bike Store, External, Garden, Garden Store, Lounge, Upper Mezzanine

Posts navigation

Older posts
Newer posts

Recent Posts

  • July 2
  • July 1
  • June 30
  • June 28
  • June 27

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.