Skip to content
  • 14:09
  • Saturday
  • 8 November 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
August 2  |  
July 31  |  
July 25  |  
July 24  |  
July 23  |  

Category: First Floor

Windows 3

13 July 202311 February 2024 gjj

Putting my temporary floor to good use. The stone wall is rebuilt on the inside over the new concrete lintel.

Continue reading
First Floor, Windows

First Floor Joists 6

10 July 202311 February 2024 gjj

I have laid the floor in the right direction this time as it is just enough for the scaffolding to fit onto. View from the bedroom window.

Continue reading
First Floor, Windows

First Floor Joists 5

8 July 202311 February 2024 gjj

First section of the floor installed. Florent will also need this side of the building to ache a floor for accessing the original windows that need their lintels raising to get the electric volets in ....

Continue reading
First Floor

First Floor Joists 4

7 July 202311 February 2024 gjj

Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....

Continue reading
External, First Floor, Ground Floor, Windows

First Floor Joists 2

5 July 202311 February 2024 gjj

I am working hard to keep ahead of Florent and his team. they need a floor in to be able to set scaffolding and work on opening the upstairs windows. so once I had enough ....

Continue reading
First Floor

First Floor Joists 1

4 July 202311 February 2024 gjj

The first floor sits between new joists and above the existing beam. First the wall joists (double) were installed and bolted with a special resin. Than the hangers added. Despite all my planning, the bolts ....

Continue reading
First Floor

Internal Walls Rendered

23 June 202311 February 2024 gjj

With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....

Continue reading
Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Floor Removal and Tidying Up

14 May 202311 February 2024 gjj

Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden, Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Making Hay 6

16 April 202311 February 2024 gjj

Sunday was a full day working with la Métairie to finally clear the upper floor. All gone at last. Just a quick sweep to finish off.

Continue reading
Guest Bedroom, Lower Mezzanine, Master Bedroom, Upper Mezzanine

Making Hay 4

14 April 202311 February 2024 gjj

Thanks to the generosity of our builder, I have been able to organise a week of moving hay for La Métairie with their volunteers. Because of Mike's (Baker) birthday bash I have had to spread ....

Continue reading
Guest Bedroom, Master Bedroom

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 2
  • July 31
  • July 25
  • July 24
  • July 23

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.