Hoists not Joists

22 July 202311 February 2024 gjj

I need to lift a lot of materials to the upper floors so I have bought and installed an electric hoist identical to the one I had at Le Chai. Making a start on the ....

Continue reading
First Floor, Garden Store

First Floor Joists 7

21 July 202311 February 2024 gjj

Finally got around to starting the next line of joists for the temporary floor for the builders to access the last of the existing windows that needs its lintel raising.

Continue reading
First Floor

Oak Flooring Moved!

20 July 202311 February 2024 gjj

Started yesterday but finished today. The oak flooring has been moved from the drive to be stored internally. Currently serving as my temporary workbench/store as it will not be needed for some time.

Continue reading
First Floor, Ground Floor

Windows 3

13 July 202311 February 2024 gjj

Putting my temporary floor to good use. The stone wall is rebuilt on the inside over the new concrete lintel.

Continue reading
First Floor, Windows

First Floor Joists 6

10 July 202311 February 2024 gjj

I have laid the floor in the right direction this time as it is just enough for the scaffolding to fit onto. View from the bedroom window.

Continue reading
First Floor, Windows

First Floor Joists 5

8 July 202311 February 2024 gjj

First section of the floor installed. Florent will also need this side of the building to ache a floor for accessing the original windows that need their lintels raising to get the electric volets in ....

Continue reading
First Floor

First Floor Joists 4

7 July 202311 February 2024 gjj

Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....

Continue reading
External, First Floor, Ground Floor, Windows

First Floor Joists 2

5 July 202311 February 2024 gjj

I am working hard to keep ahead of Florent and his team. they need a floor in to be able to set scaffolding and work on opening the upstairs windows. so once I had enough ....

Continue reading
First Floor

First Floor Joists 1

4 July 202311 February 2024 gjj

The first floor sits between new joists and above the existing beam. First the wall joists (double) were installed and bolted with a special resin. Than the hangers added. Despite all my planning, the bolts ....

Continue reading
First Floor

Internal Walls Rendered

23 June 202311 February 2024 gjj

With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....

Continue reading
Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.