Author: gjj

Jointing 3

22 August 202311 February 2024 gjj

The rear wall is bing cleaned and the joints prepared for filling while I get on with removing more of the ivy in the BBQ. All finished (except for the bits that keep growing back ....

Continue reading
BBQ/Workshop, External

Attic Trapdoor 2

22 August 202311 February 2024 gjj

Trapdoor structure finished. Looks like the far wall needs reinforcing to support the beams! View from the attic that will eventually disappear. I am waiting on some final beams to allow me to finish both ....

Continue reading
Attic

Attic Trapdoor 1

21 August 202311 February 2024 gjj

Start made on the trapdoor to the attic. Doubled beams inserted for the opening with shortened joists either side.

Continue reading
Attic

Garden Stores

21 August 202311 February 2024 gjj

Esteban has started to roof the two stores. Exterior and interior views of the rear store for the garden and the front store for the bikes.

Continue reading
Bike Store, External, Garden Store

Jointing and Joists 2

19 August 202311 February 2024 gjj

More progress on the small stores which are almost ready for roofing. They have also moved onto the rear wall which is exciting. The window detail shows we are planning to leave the raw concrete ....

Continue reading
Attic, BBQ/Workshop, Bike Store, External, Garden Store

Jointing and Joists 1

17 August 202311 February 2024 gjj

After our trip to Sancerre I returned to find that the entire end wall had been jointed and the two stores virtually finished. Looking good. The slightly darker mortar helps the stones to stand out ....

Continue reading
Attic, BBQ/Workshop, Bike Store, Garden Store

Jointing Begins

14 August 202311 February 2024 gjj

Where the walls have been cleaned, joints chiselled and jet washed, the team can at last start filling them with the chosen colour mortar. We are using a premixed coloured mortar to give consistency over ....

Continue reading
Attic, Bike Store, External, Garden Store

More on Hoists

10 August 202311 February 2024 gjj

Well the electrical hoist packed up (the control handle simply came apart and cannot be put back together again. So I have invested in a slower but reliable manual alternative. While installing it I captured ....

Continue reading
BBQ/Workshop, First Floor

BBQ/Workshop 8

9 August 202311 February 2024 gjj

The parking roof nearly finished but I am missing some pieces as they did not allow for trimming at rafters. Time to tidy up and store the PV equipment under cover.

Continue reading
BBQ/Workshop

BBQ/Workshop 7

8 August 202311 February 2024 gjj

Continue reading
BBQ/Workshop, Bike Store

Posts navigation

Older posts
Newer posts

Recent Posts

  • July 12
  • July 10
  • July 9
  • July 8
  • July 7

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.