First Floor Joists 1

4 July 202311 February 2024 gjj

The first floor sits between new joists and above the existing beam. First the wall joists (double) were installed and bolted with a special resin. Than the hangers added. Despite all my planning, the bolts ....

Continue reading
First Floor

External Concreting

4 July 202311 February 2024 gjj

I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....

Continue reading
BBQ/Workshop, Bike Store, External, Kitchen, Utility

External Concreting Preparation

30 June 202311 February 2024 gjj

The wall rendering is finished. The concrete support is re-shuttered to be raised to the new height. The hole to receive the far end of the new beam has been raised and moved to get ....

Continue reading
BBQ/Workshop, Bike Store, External, Garden, Garden Store, Lounge, Upper Mezzanine

Internal Walls Rendered

23 June 202311 February 2024 gjj

With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....

Continue reading
Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Painful Errors

20 June 202311 February 2024 gjj

Because I am taking a relaxed approach and only visiting on occasion and not daily, errors begin to occur. When I arrived today I was upset to see what looks to be cement used as ....

Continue reading
Entrance Gates and Arch, External, Kitchen, Utility

Saturday Cherry Picking and Hedging

17 June 202311 February 2024 gjj

Saturday so I had the place to myself today. I started by picking the low lying cherries so that I could then trim the branches to make access to and vision out better at the ....

Continue reading
External, Garden

Windows 1

16 June 202311 February 2024 gjj

As I am taking a more relaxed approach at the moment I did not arrive until nearly midday to find that the wall had been finished. cleaned and tiled. Henri will, be happy as it ....

Continue reading
External, Garden, Kitchen, Utility, Windows

Concrete Floor Goes In

13 June 202311 February 2024 gjj

When I arrived on site it was about an hour before the concrete was due to arrive and I found four builders busy on the separation wall which, in a morning, they had just about ....

Continue reading
Entrance Gates and Arch, External, Kitchen, Lounge, Utility

Ivy Finished! (For Now)

12 June 202311 February 2024 gjj

Having sorted the water mains and connections it was back onto sorting out the Ivy and finally the entrance arch is cleared on the roadside. I also did the front wall at the same time. ....

Continue reading
Entrance Gates and Arch

Water Mains Repair

12 June 202311 February 2024 gjj

From the first time I set up the connection the water mains have had a tiny leak on my side of the counter. I could not repair it as the water was being used by ....

Continue reading
External

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.