While the weather is still good, the kerbstones are laid to define the garden boundaries. Oops, this cables should have gone under the kerbs.
The new garden gate and the holes for services through to the cold store.
Joist hangers fitted for the first floor joists and first joist in place. Trial hole for the swimming pool to check for depth as we have decided to install a semi buried pool to reduce the problem of ground water drainage as the water table is usually quite high.