While the weather is still good, the kerbstones are laid to define the garden boundaries. Oops, this cables should have gone under the kerbs.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1561-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1563-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1568-1024x576.jpeg)
The new garden gate and the holes for services through to the cold store.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1567-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1566-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1565-1024x576.jpeg)
Joist hangers fitted for the first floor joists and first joist in place. Trial hole for the swimming pool to check for depth as we have decided to install a semi buried pool to reduce the problem of ground water drainage as the water table is usually quite high.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1564-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1562-1024x576.jpeg)