Skip to content
  • 08:41
  • Wednesday
  • 29 April 2026
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
August 31  |  
August 24  |  
August 22  |  
August 21  |  
August 20  |  

Author: gjj

Windows and Timber Frame Installation 13

16 February 202418 February 2024 gjj

Continuing yesterday’s work I have inserted more horizontal supports to frame the structure especially at the top under the existing beam. This has allowed me to Putin the vertical sheet behind the exposed stone blocks. ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 12

15 February 202416 February 2024 gjj

Took Valentine’s Day off! Back to work today. On the last leg for the timber frame. I still have to finish some of the horizontal pieces but wanted to deal with the difficult section where ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 11

13 February 202415 February 2024 gjj

Florent arrived first thing this morning and we investigated the leak together. He discovered one of the joints that had not been properly sealed and it looks as if that is where the water was ....

Continue reading
Uncategorized

Windows and Timber Frame Installation 10

12 February 202418 February 2024 gjj

What a morning. Rain, rain, rain. So I was restricted to internal jobs. Fortunately the roof overhang offered some protection that allowed me to work on the timber frame and finish off installing the main ....

Continue reading
Timber Frame

Timber Frame Cladding 2

9 February 202411 February 2024 gjj

Raining lightly when I arrived so I started outside bit it soon became too heavy and I was forced inside. So, I started to assemble the next staircase which I discovered is in three parts ....

Continue reading
Timber Frame

Timber Frame Cladding 1

8 February 202411 February 2024 gjj

The volets for the front doors (both sides) are independently installed and need a guiding rail to drop down through. the rail has to be fitted on top of the cladding so before the volet ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 9

7 February 202411 February 2024 gjj

This morning I finished off the plywood cladding and then applied the breather paper to the upper section. I then spent the afternoon finishing the fitting the battens in preparation for the cladding. The right ....

Continue reading
First Floor, Ground Floor, Timber Frame

Windows and Timber Frame Installation 8

6 February 202411 February 2024 gjj

First thing this morning was a meeting on resolving the issues with the windows with Julien Cogné. The solutions look to be OK but the rear opening in the lounge cannot be changed. We will ....

Continue reading
Timber Frame

Staircase 4

5 February 202411 February 2024 gjj

In order to work on the upper mezzanine floor and bannisters, I decided to fit the smaller staircase between the two mezzanines. I have dismantled it downstairs and taken all the steps home for Jude ....

Continue reading
Staircase

Internal Electrics

2 February 202411 February 2024 gjj

It does not looks much but it took most of the day to fit the 16mm cabling in the distribution board then make the final connection at the temporary supply. 16mm is difficult to work ....

Continue reading
Electrics, External, Ground Floor

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.