External Thresholds

15 September 202311 February 2024 gjj

After a bit of going and frying with the windows supplier we finally have agreed sizes for the thresholds for the doors and the large fixed window. Utility door with muck ready to spread, work ....

Continue reading
External

Jointing 11 (The End!)

13 September 202311 February 2024 gjj

Finally the jointing is finished. Scaffold down at the front to reveal its new face and the internal wall also cleared (although still a bit damp as it is inside). The top of the attic ....

Continue reading
Attic, External, Lounge

Jointing 10

11 September 202311 February 2024 gjj

Front wall finished today (still to be brushed off) and a start made on the internal wall. Almost there.

Continue reading
External, Lounge

Jointing 9

8 September 202311 February 2024 gjj

Rear wall finished and dry. End wall finished and still wet at the base. Good progress on the front wall.

Continue reading
External

PV Panels 2

8 September 202311 February 2024 gjj

As part of clearing the car parking I have had to move all the PV panels, not just those for the BBQ area. Discovered a second one damaged unfortunately so that will also need replacing. ....

Continue reading
BBQ/Workshop, Car Park

Window Cills

7 September 202311 February 2024 gjj

Some time ago Florent sourced some stone window cills but they were not deep enough for the window supplier. Some of the replacements have finally arrived and have been fitted at the rear of the ....

Continue reading
External

PV Panels 1

6 September 202311 February 2024 gjj

Having readily I can both form the boxes and the company websites I was finally ready to begin installing the PV panels. The first job was to unpack one to check measurements and I was ....

Continue reading
BBQ/Workshop

Jointing 8

6 September 202311 February 2024 gjj

The rear wall is finally finished (still wet). The end wall just needs the lower level finishing off so the scaffolding is moved to the front of the house to begin cleaning out the joints ....

Continue reading
External

Jointing 7

5 September 202311 February 2024 gjj

With the scaffolding down the wall can be seen and it looks fantastic. Small section around the tie bar to be finished off but the building is starting to look refreshed. Work has begun on ....

Continue reading
External

Jointing and Joists 6

4 September 202311 February 2024 gjj

The holidays over, the entire team is back on site full of energy. As Esteban had virtually finished the rear wall except fro some low level areas, the scaffolding was stripped and prepared for the ....

Continue reading
Attic, External

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.