The holidays over, the entire team is back on site full of energy. As Esteban had virtually finished the rear wall except fro some low level areas, the scaffolding was stripped and prepared for the end wall. half way through it was 16:30 so down tools and finish tomorrow! I continued with the joists by adding some noggins but as they have not finished rendering the top of the wall in the attic, they ache asked me to leave the joists free for them to get access. So I just cot the noggins then marked and preset the screws in the joists where they are going.