15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 19  |  
May 16  |  
May 15  |  
May 14  |  
May 10  |  

Category: Kitchen

Final Floor Beams 2

21 October 202311 February 2024 gjj

The concrete base has gone into the garden store. And the new replacement beam has been installed over the existing one that gave me concerns at one end. Also te high level beam is in ....

Continue reading
Attic, First Floor, Garden Store, Ground Floor, Kitchen, Lounge, Lower Mezzanine, Upper Mezzanine

First Floor Joists 3

6 July 202311 February 2024 gjj

With the floor in, the windows can be started at the back of the house. To get the scaffolding up outside the eventually pathway needed to be part laid. By the end of the day ....

Continue reading
External, Kitchen, Lounge

External Concreting

4 July 202311 February 2024 gjj

I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....

Continue reading
BBQ/Workshop, Bike Store, External, Kitchen, Utility

Internal Walls Rendered

23 June 202311 February 2024 gjj

With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....

Continue reading
Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Painful Errors

20 June 202311 February 2024 gjj

Because I am taking a relaxed approach and only visiting on occasion and not daily, errors begin to occur. When I arrived today I was upset to see what looks to be cement used as ....

Continue reading
Entrance Gates and Arch, External, Kitchen, Utility

Windows 1

16 June 202311 February 2024 gjj

As I am taking a more relaxed approach at the moment I did not arrive until nearly midday to find that the wall had been finished. cleaned and tiled. Henri will, be happy as it ....

Continue reading
External, Garden, Kitchen, Utility, Windows

Concrete Floor Goes In

13 June 202311 February 2024 gjj

When I arrived on site it was about an hour before the concrete was due to arrive and I found four builders busy on the separation wall which, in a morning, they had just about ....

Continue reading
Entrance Gates and Arch, External, Kitchen, Lounge, Utility

PV Panels And Another Cable

2 June 202311 February 2024 gjj

After pouring the concrete for the lintel above the door, the team got back to floor preparation laying the reinforcing bar for the concrete pour. We wanted to organise it for this week but the ....

Continue reading
Car Park, Entrance Gates and Arch, External, Kitchen, Lounge, Utility

More Floor and Lintels

1 June 202311 February 2024 gjj

Yesterday we had a visit from the windows supplier to agree the height of the lintels above the new door in the utility room and for the existing windows. Florent can now get on with ....

Continue reading
Kitchen, Lounge, Utility

Electrics and External Progress

26 May 202311 February 2024 gjj

The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....

Continue reading
BBQ/Workshop, Car Park, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 19
  • May 16
  • May 15
  • May 14
  • May 10

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.