Jointing 11 (The End!)
Finally the jointing is finished. Scaffold down at the front to reveal its new face and the internal wall also cleared (although still a bit damp as it is inside). The top of the attic ....
Views of the property from the outside
Finally the jointing is finished. Scaffold down at the front to reveal its new face and the internal wall also cleared (although still a bit damp as it is inside). The top of the attic ....
Front wall finished today (still to be brushed off) and a start made on the internal wall. Almost there.
Rear wall finished and dry. End wall finished and still wet at the base. Good progress on the front wall.
Some time ago Florent sourced some stone window cills but they were not deep enough for the window supplier. Some of the replacements have finally arrived and have been fitted at the rear of the ....
The rear wall is finally finished (still wet). The end wall just needs the lower level finishing off so the scaffolding is moved to the front of the house to begin cleaning out the joints ....
With the scaffolding down the wall can be seen and it looks fantastic. Small section around the tie bar to be finished off but the building is starting to look refreshed. Work has begun on ....
The holidays over, the entire team is back on site full of energy. As Esteban had virtually finished the rear wall except fro some low level areas, the scaffolding was stripped and prepared for the ....
While Esteban made progress along the rear wall I cleared the car parking area in preparation for the foundations for the second pergola. It meant relocating the site caravan which is now happily sat in ....
Having cleaned the walls and chiselled the joints, Esteban has got on with jointing the rear wall. Starting to look good. The mortar colour we chose looks good and helps define the stones.
The rear wall is bing cleaned and the joints prepared for filling while I get on with removing more of the ivy in the BBQ. All finished (except for the bits that keep growing back ....