First job is to paint behind the second column. First coat up and drying.

While the paint dries the plasterboard is installed (uninsulated as it is the cold room).

Some of the offcuts are used on the shower room walls.
The second coat of paint is applied and dries before the backing plate for the column is screwed in place.

Finally the box backs and rails are fitted.