Skip to content
  • 22:08
  • Thursday
  • 22 May 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 19  |  
May 16  |  
May 15  |  
May 14  |  
May 10  |  

Category: Timber Frame

Windows and Timber Frame Installation 13

16 February 202418 February 2024 gjj

Continuing yesterday’s work I have inserted more horizontal supports to frame the structure especially at the top under the existing beam. This has allowed me to Putin the vertical sheet behind the exposed stone blocks. ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 12

15 February 202416 February 2024 gjj

Took Valentine’s Day off! Back to work today. On the last leg for the timber frame. I still have to finish some of the horizontal pieces but wanted to deal with the difficult section where ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 10

12 February 202418 February 2024 gjj

What a morning. Rain, rain, rain. So I was restricted to internal jobs. Fortunately the roof overhang offered some protection that allowed me to work on the timber frame and finish off installing the main ....

Continue reading
Timber Frame

Timber Frame Cladding 2

9 February 202411 February 2024 gjj

Raining lightly when I arrived so I started outside bit it soon became too heavy and I was forced inside. So, I started to assemble the next staircase which I discovered is in three parts ....

Continue reading
Timber Frame

Timber Frame Cladding 1

8 February 202411 February 2024 gjj

The volets for the front doors (both sides) are independently installed and need a guiding rail to drop down through. the rail has to be fitted on top of the cladding so before the volet ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 9

7 February 202411 February 2024 gjj

This morning I finished off the plywood cladding and then applied the breather paper to the upper section. I then spent the afternoon finishing the fitting the battens in preparation for the cladding. The right ....

Continue reading
First Floor, Ground Floor, Timber Frame

Windows and Timber Frame Installation 8

6 February 202411 February 2024 gjj

First thing this morning was a meeting on resolving the issues with the windows with Julien Cogné. The solutions look to be OK but the rear opening in the lounge cannot be changed. We will ....

Continue reading
Timber Frame

Timber Frame Cladding Arrives

1 February 202411 February 2024 gjj

Sitting happily at home catching up with paperwork I got an urgent call from my neighbor Andrew. Apparently a lorry had arrived from Estonia with no notice containing our timber cladding of charred and oiled ....

Continue reading
External, Timber Frame

Windows and Timber Frame Installation 7

22 December 202311 February 2024 gjj

Friday before Christmas and I am closing the site until the New Year to have a break and to allow my back to get better. Esteban once again concentrated on the structure over the main ....

Continue reading
Timber Frame, Windows

Posts navigation

Newer posts

Recent Posts

  • May 19
  • May 16
  • May 15
  • May 14
  • May 10

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.