Category: First Floor

Staircase 2, First Floor Flooring 12

7 June 202425 June 2024 gjj

On with the staircase. VIPs (Wiz and Josie) coming Wednesday week so I need to give them some safe access to the first floor. Once the second stringer was in place I turned my attention ....

Continue reading
First Floor, Staircase

First Floor Flooring 12, Workshop Interior 1, Staircase 1

6 June 202425 June 2024 gjj

In order to continue with the flooring upstairs I have laid the second plywood sheet for the en-suite but still need some more to trim off the end which is at an odd angle. In ....

Continue reading
BBQ/Workshop, First Floor, Staircase

Garden Clearance and First Floor Flooring 11

4 June 202424 June 2024 gjj

On my mission to clear the garden before Florent returns, I decided to move the doors I recovered from the fire damaged house. They have been leaning against the tree for over a year now. ....

Continue reading
First Floor, Garden

First Floor Flooring 10

30 May 202424 June 2024 gjj

On my own again with the tilers gone. Took yesterday off after a straight 10 days on site. So it is back upstairs to the first floor oak parquet. An example of how I will ....

Continue reading
First Floor

Ground Floor Tiling 5

21 May 202424 June 2024 gjj

Big panic today. I realised a few days ago that I had not installed a drainage outlet for the shower on the ground floor. So I have urgently organised some components and today I am ....

Continue reading
First Floor

First Floor Flooring 9, EV Charger installed

15 May 202423 June 2024 gjj

A record of the position of the central point of the fibre optic cable where the rods were brought together. Now all buried and without the inspection chamber that is now redundant. On the first ....

Continue reading
Car Park, First Floor, Garden, Services

Fibre Optic Arrives. First Floor Flooring 8

14 May 202424 June 2024 gjj

The free.com engineer is due this afternoon so I spent this morning with some small issues. First, I have installed a threshold for the workshop door as there will be different tiling inside the workshop ....

Continue reading
First Floor, Garden, Services

More Minor Changes and First Floor Flooring 6

7 May 202423 June 2024 gjj

The finished repair of the front arch. Some changes to the kerbstones. The heat pump position had to be changed (the base was extended some time ago for it) so the pathway became too narrow ....

Continue reading
Entrance Gates and Arch, External, First Floor, Garden, Garden Store, Services, Waste System

Workshop Window and First Floor Flooring 5

6 May 202423 June 2024 gjj

Today Florent and his team are back on site for a couple of days to sort out some minor snagging issues. So I have got them to help me fit the large fixed window in ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, First Floor, Windows

First Floor Flooring 4

2 May 202422 June 2024 gjj

With the heating pipes completed I am able to look at other issues so have started to construct a missing wall in the workshop. Meanwhile, almost imperceptibly, the first floor continues to advance.

Continue reading
BBQ/Workshop, First Floor

Posts navigation

Older posts
Newer posts

Recent Posts

  • July 2
  • July 1
  • June 30
  • June 28
  • June 27

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.