December 17
In preparation for the first floor electrics I ache had a big tidy up, sweep up and vacuum. It needed it.
Relaid the tarpaulin and added some sheets of OSB to protect the oak floor.
In preparation for the first floor electrics I ache had a big tidy up, sweep up and vacuum. It needed it.
Relaid the tarpaulin and added some sheets of OSB to protect the oak floor.