July 8
With the en-suite done, it is into the guest bedroom. Cabling for lights done so up with the first plasterboard. By mid afternoon the ceiling is up. The holes for the light have not been ....
With the en-suite done, it is into the guest bedroom. Cabling for lights done so up with the first plasterboard. By mid afternoon the ceiling is up. The holes for the light have not been ....
Insulation and cabling in I can start with the ceiling in the guest bedroom ensuite. As part of the insulation clear out process I have also finished most of the wall insulation for the office ....
Before fitting the ceiling plasterboard I have to prepare the cabling for the lights and also for the fans. in addition I have to get the fans out to an external point to ventilate the ....
The wall alongside the en-suite has taken most of the morning as it was full of wiring and switches. Insulation, vapour barrier, plasterboard. Then on to the next section.
Insulation of most the walls now done and the new corner has been boarded. I need to collect some more insulation tomorrow morning.
With the en-suite done I have moved into the master bedroom. Finally finished screwing the boards in place and am continuing applying others. Slight amendment as I needed to extend one of the walls so ....
Another Saturday shift as I try to get as much of the plasterboard up as I can before Lee and Jacq come to do the jointing. By the end of the day, the en-suite is ....
Guest bedroom finished so now I am doing the master bedroom en-suite. First of all I had to build a similar support system for the towel rail as well as organise the electrical items for ....
A bit of jiggery-pokery and some plaster infill sees the first window and reveals sorted in the guest bedroom.