First Floor Flooring 9, EV Charger installed
A record of the position of the central point of the fibre optic cable where the rods were brought together. Now all buried and without the inspection chamber that is now redundant. On the first ....
Views of the property from the outside
A record of the position of the central point of the fibre optic cable where the rods were brought together. Now all buried and without the inspection chamber that is now redundant. On the first ....
The free.com engineer is due this afternoon so I spent this morning with some small issues. First, I have installed a threshold for the workshop door as there will be different tiling inside the workshop ....
I have removed the plastic shuttering for the fountain foundation and have started playing with how it will look. I was just about able to move the base unit in which the pump is housed. ....
The finished repair of the front arch. Some changes to the kerbstones. The heat pump position had to be changed (the base was extended some time ago for it) so the pathway became too narrow ....
Today Florent and his team are back on site for a couple of days to sort out some minor snagging issues. So I have got them to help me fit the large fixed window in ....
Using my glass suction handles and a bit of ingenuity, I have been able to get the glass out of the frame and stood on some blankets. I have then fitted the frame in place ....
With the heating pipes completed I am able to look at other issues so have started to construct a missing wall in the workshop. Meanwhile, almost imperceptibly, the first floor continues to advance.
The plug has arrived so I have wired up the charger properly to feed back to the board. Only to find it is the wrong plug!
While I got on with finishing my panelling in the car park, Stephane sorted the incoming main and fitted a tap in the BBQ area. With the panelling all up I was able to refit ....
I am using some of the oak I cut that was not used to support the electrical panel in the car park. Stephane is coming tomorrow to redo the plumbing so I have taken it ....