Skip to content
  • 14:07
  • Saturday
  • 10 May 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 3  |  
April 30  |  
April 29  |  
April 28  |  
April 24  |  

Category: External

Views of the property from the outside

Jointing and Joists 6

4 September 202311 February 2024 gjj

The holidays over, the entire team is back on site full of energy. As Esteban had virtually finished the rear wall except fro some low level areas, the scaffolding was stripped and prepared for the ....

Continue reading
Attic, External

Jointing 5

1 September 202311 February 2024 gjj

While Esteban made progress along the rear wall I cleared the car parking area in preparation for the foundations for the second pergola. It meant relocating the site caravan which is now happily sat in ....

Continue reading
BBQ/Workshop, External, Garden

Jointing 4

30 August 202311 February 2024 gjj

Having cleaned the walls and chiselled the joints, Esteban has got on with jointing the rear wall. Starting to look good. The mortar colour we chose looks good and helps define the stones.

Continue reading
External

BBQ Roof 2

28 August 202311 February 2024 gjj

Weekend over so up on the roof installing the bolts to secure the roof panels. I was not happy with the spacing so took it all apart and adjusted it to get a more balanced ....

Continue reading
BBQ/Workshop

BBQ Roof 1

25 August 202311 February 2024 gjj

With the sarking wood finished I started to install the covering. First the paper that I stapled to the roof temporarily before then laying out the battens. Drawings and instructions would have been useful. I ....

Continue reading
BBQ/Workshop

Storage

24 August 202311 February 2024 gjj

At the moment there is just me and Esteban on site as everyone else is on holiday. Progress has slowed but not stopped. The tiles have been set on the two stores and the bike ....

Continue reading
BBQ/Workshop, Bike Store, Garden Store

Jointing 3

22 August 202311 February 2024 gjj

The rear wall is bing cleaned and the joints prepared for filling while I get on with removing more of the ivy in the BBQ. All finished (except for the bits that keep growing back ....

Continue reading
BBQ/Workshop, External

Garden Stores

21 August 202311 February 2024 gjj

Esteban has started to roof the two stores. Exterior and interior views of the rear store for the garden and the front store for the bikes.

Continue reading
Bike Store, External, Garden Store

Jointing and Joists 2

19 August 202311 February 2024 gjj

More progress on the small stores which are almost ready for roofing. They have also moved onto the rear wall which is exciting. The window detail shows we are planning to leave the raw concrete ....

Continue reading
Attic, BBQ/Workshop, Bike Store, External, Garden Store

Jointing and Joists 1

17 August 202311 February 2024 gjj

After our trip to Sancerre I returned to find that the entire end wall had been jointed and the two stores virtually finished. Looking good. The slightly darker mortar helps the stones to stand out ....

Continue reading
Attic, BBQ/Workshop, Bike Store, Garden Store

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.