Storage

At the moment there is just me and Esteban on site as everyone else is on holiday. Progress has slowed but not stopped. The tiles have been set on the two stores and the bike store can be used (although the dividing wall still needs to be finished once the enormous bush growing in the wall is defeated). The rear store still needs the concrete floor to be installed so little point in trying to use it yet.

So a delivery of shelving, tools and bric a brac took place to enable me to move my things out of the main house and into a new temporary workshop.

With the tools installed I then sorted out the missing parts from the BBQ roof. The wood had to be ripped down for the final strip but it is now all done and ready for covering.