Skip to content
  • 12:30
  • Saturday
  • 13 June 2026
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
August 31  |  
August 24  |  
August 22  |  
August 21  |  
August 20  |  

Category: Ground Floor

Underfloor Heating 7

1 May 202422 June 2024 gjj

Before encasing it in concrete, it is always a good idea to pressure test it for any leaks. (It passed).

Continue reading
Ground Floor, Plumbing

Underfloor Heating 6

29 April 202422 June 2024 gjj

The last item to remove from the house is the old stairs from our old property that I have been using to get up to the first floor with. With the floor clear I can ....

Continue reading
Ground Floor, Plumbing

Underfloor Heating 5

22 April 202422 June 2024 gjj

I am pressing on with the heating as the floor screeners are due soon and this must be finished for them. In order to avoid moving the (heavy) roll of tubing all the time I ....

Continue reading
Ground Floor, Plumbing

Underfloor Heating 4

20 April 202422 June 2024 gjj

Back indoors and downstairs to fit the next loop in the heating. This time it is the kitchen, avoiding not just the walls but also the future units including the island un unit. Working with ....

Continue reading
Ground Floor, Kitchen, Plumbing

Underfloor Heating 3

16 April 202422 June 2024 gjj

While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....

Continue reading
Ground Floor, Lower Mezzanine, Plumbing, Upper Mezzanine

Underfloor Heating 2

3 April 202422 June 2024 gjj

The first of the heating loops is installed. I took some measures as it is close to where a future enclosure in the bathroom is going to go. Having said that it will be covered ....

Continue reading
Ground Floor, Plumbing

Underfloor Heating 1

2 April 202422 June 2024 gjj

Before the floor can be done I need to remove the scaffolding we have been using for the upper mezzanine. However, before removing them I need to finish preparing the beams for the oak flooring. ....

Continue reading
External, Ground Floor, Plumbing

Windows and Timber Frame Installation 9

7 February 202411 February 2024 gjj

This morning I finished off the plywood cladding and then applied the breather paper to the upper section. I then spent the afternoon finishing the fitting the battens in preparation for the cladding. The right ....

Continue reading
First Floor, Ground Floor, Timber Frame

Internal Electrics

2 February 202411 February 2024 gjj

It does not looks much but it took most of the day to fit the 16mm cabling in the distribution board then make the final connection at the temporary supply. 16mm is difficult to work ....

Continue reading
Electrics, External, Ground Floor

Tidying Up

30 January 202411 February 2024 gjj

Excellent weather for opening the doors and tidying up the interior before offloading the latest timber delivery. Florent has once again organised the purchase and lent me his lorry to bring it to site. Esteban ....

Continue reading
Car Park, External, Ground Floor, Staircase

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.