PV Panels 3
Both sides of the roof are now extended and recovered. Rear of the house from the fence line.
Views of the property from the outside
Both sides of the roof are now extended and recovered. Rear of the house from the fence line.
Finished off the timber framing of the workshop including the second window opening. Both verticals and horizontals for the eventual cladding. extending the sides of the roof for the PV panels. In between other work ....
Now that the doors and windows are in, birds that get in via the roof cannot get out through the openings. I keep finding them near the doors where they have literally knocked themselves senseless. ....
A break in the weather so I have started to install the support system for the panels and inverters on the car park and BBQ/Workshop roofs.
Time to move inside and make a start on the floor for the office on the upper mezzanine. First I had to finish securing the oak strengthening beams using the M12 threaded bar. Outside I ....
Today I decided to finish off the guttering to divert the water away from the wall and front of the BBQ. I still need to install a set of down pipes but they are less ....
I dismantled my supports to paint them with a protective black stain prior to installing them. I used the same stain to finish off the cut sections of the timber frame. Here are before and ....
Started the day by trimming the joists in preparation for the oak fascia that has now been ordered but will a 4 to 6 week delivery! Experimented with the oak flooring to see how to ....
As part of the balcony installation I need to install a fascia for the bolts. As I only had one beam left I decided to cut it in half lengthways. What a job! Even cutting ....
Since we bought the land I have wanted to sort and prune the fruit trees which have not been tended to for some years. I never got around to it at the last house but ....