15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 19  |  
May 16  |  
May 15  |  
May 14  |  
May 10  |  

Category: External

Views of the property from the outside

Bits and Bobs

4 April 202422 June 2024 gjj

Despite the heavy trimming they have received, all of the fruit trees are blossoming. It was a relatively dry day so I got outside to do a list of little jobs that were outstanding. Moved ....

Continue reading
BBQ/Workshop, External, Garden

Underfloor Heating 1

2 April 202422 June 2024 gjj

Before the floor can be done I need to remove the scaffolding we have been using for the upper mezzanine. However, before removing them I need to finish preparing the beams for the oak flooring. ....

Continue reading
External, Ground Floor, Plumbing

PV Panels 8

29 March 202422 June 2024 gjj

I have finished cabling the panels on the car park roof and today the underfloor heating pipe is finally on site. All 500m of it. Should have been done before they fitted the heat pump ....

Continue reading
Electrics, External, Photovoltaic Panels

EV Charger

27 March 202422 June 2024 gjj

To enable the electrical earth to be tested, each of the three earthing points I have installed needs a breaker fitted. This allows the earth to be disconnected and tested then reconnected and tested to ....

Continue reading
Car Park, Electrics

PV Panels 6

25 March 202416 June 2024 gjj

Each panel has its own inverter (so if a panel or an inverter fail, the rest of the system still keeps working). These are all connected via cables and plugs. It is a 3 phase ....

Continue reading
Car Park, Photovoltaic Panels

PV Panels 5

22 March 202416 June 2024 gjj

Car park panel supports fitted. Took time to saw some of the old beams from the upper mezzanine for future firewood. All stored behind the fence to keep the garden clear.

Continue reading
Car Park, Garden, Photovoltaic Panels

Workshop 2

22 March 202416 June 2024 gjj

With the frame in place, I have covered it with a breathable membrane. I t gives a good impression of the final space. On the car park roof the positioning of the supports for the ....

Continue reading
BBQ/Workshop, Car Park, Photovoltaic Panels

PV Panels 4

20 March 202416 June 2024 gjj

With both sides doe I can finally fit the rear trim to the roof. It has to be trimmed as the rear and side trims clash at the corners. So, on to the Car Park ....

Continue reading
BBQ/Workshop, Car Park, Photovoltaic Panels

PV Panels 3

19 March 202416 June 2024 gjj

Both sides of the roof are now extended and recovered. Rear of the house from the fence line.

Continue reading
BBQ/Workshop, External, Garden, Photovoltaic Panels

Workshop 1

18 March 202422 June 2024 gjj

Finished off the timber framing of the workshop including the second window opening. Both verticals and horizontals for the eventual cladding. extending the sides of the roof for the PV panels. In between other work ....

Continue reading
BBQ/Workshop, External, Garden

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 19
  • May 16
  • May 15
  • May 14
  • May 10

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.