PV Panels 8
I have finished cabling the panels on the car park roof and today the underfloor heating pipe is finally on site. All 500m of it.
Should have been done before they fitted the heat pump but I am just about able to get in to sort out the cabling from inside the house into the gains that will eventually run to the sewage system and stone table area for power and tree lights.