
July 11
Florent arrives on site and the piles of stone are finally cleared. Large formations stones from old farm buildings that have been excavated during the works are moved (by me) to the storage area. More ....
Florent arrives on site and the piles of stone are finally cleared. Large formations stones from old farm buildings that have been excavated during the works are moved (by me) to the storage area. More ....
The small lawn in front of the BBQ is finally cleared up to the top end storage area. The rear of the house is also cleared with items returned into the garden store (I will ....
The sewage fosse arrives! It is a lot bigger than it looks in the pictures. Main chamber on the right and the overflow liquid chamber on the right. An internal pump aerates the liquids and ....
Back to the PV panels while the sun shines. Up the ladder for a quick check on dimensions and I intend trying the plasterboard lifter to get the panels up on to the roof rather ....
Tidying up the site after the tilers have gone. Flower pots appear on the patio and more washing down of the slabs. Last of the big pots moved. Cladding wood moved and stored in the ....
Grouting finished, Metawaley stands back and admires his work while I start the big sweep and wash. Will need to be done several times over the next few days. And find some time to do ....
Since we bought the land I have wanted to sort and prune the fruit trees which have not been tended to for some years. I never got around to it at the last house but ....
Florent arrived first thing this morning and we investigated the leak together. He discovered one of the joints that had not been properly sealed and it looks as if that is where the water was ....