Author: gjj

Underfloor Heating 3

16 April 202422 June 2024 gjj

While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....

Continue reading
Ground Floor, Lower Mezzanine, Plumbing, Upper Mezzanine

First Floor Flooring 1

15 April 202422 June 2024 gjj

So, with the upper mezzanine done I have moved to the lower mezzanine which is also the first floor and made a start on the oak flooring. I have had to jigsaw the boarding around ....

Continue reading
First Floor, Lower Mezzanine

Upper Mezzanine Floor 11

12 April 202422 June 2024 gjj

This morning I finished off the final sections of the floor and trimmed it back to the beam before nailing it down. Looks good from above and below but despite my careful sorting it appears ....

Continue reading
BBQ/Workshop, Upper Mezzanine

Upper Mezzanine Floor 10

11 April 202422 June 2024 gjj

While I progressed the flooring on the mezzanine, Socover returned to site to do some alterations to the windows and doors. The biggest change was the reversal of the door hinging on the door to ....

Continue reading
Upper Mezzanine

Upper Mezzanine Floor 9

10 April 202422 June 2024 gjj

Good progress on the floor. The end will need to be trimmed against the beam and then cloaked by the oak panel when it finally arrives. I can now stand on it to work from. ....

Continue reading
Upper Mezzanine

Upper Mezzanine Floor 8

9 April 202422 June 2024 gjj

Sanding finished. Before and after shots that show the black stains removed. I then set out the first line of the parquet flooring. I started on this side so the Final Cut piece will be ....

Continue reading
Upper Mezzanine

Upper Mezzanine Floor 7

8 April 202422 June 2024 gjj

Sanding back the surface on the beams prior to starting to lay the floor.

Continue reading
Upper Mezzanine

Workshop 3

5 April 202422 June 2024 gjj

This window was rescued from the old house after thrice as it was in an area that avoided the worst of the fire. Now fitted and the cladding added around it. The large hole will ....

Continue reading
BBQ/Workshop

Bits and Bobs

4 April 202422 June 2024 gjj

Despite the heavy trimming they have received, all of the fruit trees are blossoming. It was a relatively dry day so I got outside to do a list of little jobs that were outstanding. Moved ....

Continue reading
BBQ/Workshop, External, Garden

Underfloor Heating 2

3 April 202422 June 2024 gjj

The first of the heating loops is installed. I took some measures as it is close to where a future enclosure in the bathroom is going to go. Having said that it will be covered ....

Continue reading
Ground Floor, Plumbing

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.