Fibre Optic Preparation

10 May 202423 June 2024 gjj

No photos today. Just me and Phillipe our neighbour on site pulling through fibre rods in preparation for the visit next week of free.com to install the fibre optique cables. It has been a long ....

Continue reading
Services

More Minor Changes and First Floor Flooring 6

7 May 202423 June 2024 gjj

The finished repair of the front arch. Some changes to the kerbstones. The heat pump position had to be changed (the base was extended some time ago for it) so the pathway became too narrow ....

Continue reading
Entrance Gates and Arch, External, First Floor, Garden, Garden Store, Services, Waste System

Workshop Window and First Floor Flooring 5

6 May 202423 June 2024 gjj

Today Florent and his team are back on site for a couple of days to sort out some minor snagging issues. So I have got them to help me fit the large fixed window in ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, First Floor, Windows

Workshop Window

3 May 202422 June 2024 gjj

Using my glass suction handles and a bit of ingenuity, I have been able to get the glass out of the frame and stood on some blankets. I have then fitted the frame in place ....

Continue reading
BBQ/Workshop, Windows

First Floor Flooring 4

2 May 202422 June 2024 gjj

With the heating pipes completed I am able to look at other issues so have started to construct a missing wall in the workshop. Meanwhile, almost imperceptibly, the first floor continues to advance.

Continue reading
BBQ/Workshop, First Floor

Underfloor Heating 7

1 May 202422 June 2024 gjj

Before encasing it in concrete, it is always a good idea to pressure test it for any leaks. (It passed).

Continue reading
Ground Floor, Plumbing

Underfloor Heating 6

29 April 202422 June 2024 gjj

The last item to remove from the house is the old stairs from our old property that I have been using to get up to the first floor with. With the floor clear I can ....

Continue reading
Ground Floor, Plumbing

First Floor Flooring 3

26 April 202422 June 2024 gjj

In order to install the final heating loop I have had to take down the scaffolding that has been there for ever it seems. The ground floor is now clear. As I explained earlier the ....

Continue reading
First Floor

First Floor Flooring 2

24 April 202422 June 2024 gjj

Spot the difference? I have actually made some progress with the oak flooring on the first floor.

Continue reading
First Floor

Car Park EV Charger

23 April 202422 June 2024 gjj

The plug has arrived so I have wired up the charger properly to feed back to the board. Only to find it is the wrong plug!

Continue reading
Car Park, Electrics

Posts pagination

Previous page Page 1 … Page 18 Page 19 Page 20 … Page 42 Next page

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.